View Single Post
  #1  
Old 2010-04-29
jim jim is offline
Past President
First Name: James
Last Name: Steger
MAAC Number: 73069
WIMAC WINGS: Solo Planes
 
Join Date: May 2009
Posts: 170
jim is on a distinguished road
Field day work - May 8th, 2010

Field day is scheduled for May 8th, 2010:

I have compliled a list of things we will try and complete on field day.
1. Install conveyor belt material over 10 x 10 gravel for engine break-in pit.
(I already placed the gravel and roughly raked it smooth). Does anybody know if we have stakes or long nails to hold down conveyor belt material?
2. Paint or stain our stands (I heard someone mention that we had stain left over from the Impound box, can anybody confim this and how much is there.)
3. Replace noodles.
4. Install heli backdrop fence. (Jim will this be ready for field day).
5. Install new gas plane start box next to old one so we could have 2.
6. Install noise barrier for engine break-in pit. (I need to order wood for this) I'll confirm wood size and give measurments to Bill (Bill we will pay you for this wood). Does anybody have any re-bar to install the noise barrier?
7. Install small gravel path from plane pit to engine break-in pit.
8. Sweep or blow plane and heli pits clean.
9. Secure surronding fence (some places are sagging pretty bad)

Did I forget anything?

Last edited by xed; 2010-05-02 at 07:53 AM.
Reply With Quote